Project

2 sound-absorbing cabinets for the drinking water supply

FCG has built 2 sound-damping cabinets for the drinking water supply.

Including fans and silencers for cooling. This was a nice assignment to carry out!

Twee geluiddempende kasten voor de drinkwatervoorziening Brabant
Twee geluiddempende kasten voor de drinkwatervoorziening Brabant
Twee geluiddempende kasten voor de drinkwatervoorziening Brabant
Twee geluiddempende kasten voor de drinkwatervoorziening Brabant
Twee geluiddempende kasten voor de drinkwatervoorziening Brabant
Twee geluiddempende kasten voor de drinkwatervoorziening Brabant
Projects
Flue Gas Filter Overhaul
Construction installed and insulated in Croatia
Insulation of refrigeration and freezing systems in a distribution center
Cryogenic insulation of an LNG tanker
Loading arms with high-quality thermal insulation
Distribution center Veghel
Distribution center Veghel
Insulation mattresses on MTS Ravel
Insulation mattresses on MTS Ravel
The RTO on site in Denmark is ready for top performance
The RTO on site in Denmark is ready for top performance
Catalyst Insulation
Catalyst Insulation
Insulating flowmeters in combination with heat tracing
Insulating flowmeters in combination with heat tracing
Maximum efficiency with cold insulation
Maximum efficiency with cold insulation
A Behind-the-Scenes Look at Damen Gorinchem
A Behind-the-Scenes Look at Damen Gorinchem
WV147 insulation at Dutch Falcon Yachts
WV147 insulation at Dutch Falcon Yachts
Insulating and finishing of a flue gas filter in England
Insulating and finishing of a flue gas filter in England
Insulate fans
Insulate fans
Pump skids equipped with Armaflex
Pump skids equipped with Armaflex
More than 6000 m2 of aluminum sheet metal prefabricated and installed in England
More than 6000 m2 of aluminum sheet metal prefabricated and installed in England
A cone with a diameter of 1000 mm that fits perfectly onto a bend of 2500 mm
A cone with a diameter of 1000 mm that fits perfectly onto a bend of 2500 mm
Insulating cooling system
Insulating cooling system
Insulating and finishing the flue gas filter
Insulating and finishing the flue gas filter
Export of materials
Export of materials
Ventilators equipped with insulation and sheet metal
Ventilators equipped with insulation and sheet metal
Insulating technical spaces
Insulating technical spaces
Rebuild
Rebuild
Sound absorbing cabinets mounted on bilge boat
Sound absorbing cabinets mounted on bilge boat
Insulating piping and boilers
Insulating piping and boilers
2 sound-absorbing cabinets for the drinking water supply
2 sound-absorbing cabinets for the drinking water supply
Insulating storage tanks – Poland
Insulating storage tanks – Poland
Insulating storage tanks – Amsterdam
Insulating storage tanks – Amsterdam
THe 109-meter-long superyacht has been launched
THe 109-meter-long superyacht has been launched
Refrigeration technology, insulation – Second Maasvlakte Rotterdam
Refrigeration technology, insulation – Second Maasvlakte Rotterdam
Insulating storage tanks – Amsterdam
Insulating storage tanks – Amsterdam
Pipework, tanks trace and aluminum sheet metal finishing – coevorden
Pipework, tanks trace and aluminum sheet metal finishing – coevorden

Personal advice

Do you want to know what the best solution is for your insulation problem? Please feel free to contact us for expert advice. Because can not, does not exist!